La Tuque hydrolectric power plant
This project consisted in renewing the design life (30 years) of engineering works, structures, water carriage and production equipment stability and integrity of structures, while maintaining the hydroelectric power plant safe. The back-up equipment was analyzed to assess the needs for a more powerful turbine-generator unit (30% and over). Among the components analyzed: evaluation adn rehabilitation of structures; repair or replacement of mechanical equipment for water carriage; repair or replacement of production equipment, including power plant's back-up equipment; replacement and modernization of auxiliary mechanical and electrical equipment.
Services provided
- General concept study and specific studies
- Cost assessment
- Replacement of high voltage cables
- Dismantling of existing substation
- Layout of electrical and civil maintenance workshops
- Rehabilitation of control room
- Rehabilitation of gantry
- Management of quality assurance program
- Stabilization of slopes
- Rehabilitation of auxiliary electrical services 13,8 kV and 600 V
- Auxiliary mechanical services (air water, oil) and HVAC systems
- Construction of service building between dam and power plant
|